Remodel &

JJC added 175 sq ft at the rear of an existing single-family home and reworked the interior to create two new bathrooms and an open-concept kitchen — including removal of an interior load-bearing wall for the new layout. The addition was engineered with new footings tied into the existing foundation and a full Simpson shear wall system. Fully permitted, HERS-tested, and built to 2022 Title 24 and 2023 LA Green Building Code standards.

Addition

Kitchen & Bath Remodel with Rear Addition

Best fit when the bones of the house are solid but the layout isn't working: outdated kitchen, not enough bathrooms, or a cramped floor plan. JJC combines structural additions with interior reconfiguration to open up the space without a teardown.

How it started...

little later...

Current job.

UPDATED WEEKLY MORE TO COME...